Design-Build Projects:
Central Compost Facility, Brookfield, PEI
30,000 T/yr containerized MSW composting technology;
producing Category A compost;
fully automated aeration and effective odour control;
fast track project - 12 months from contract award to start-up;
Awards: Compost Council of Canada - Award of Merit; Consulting Engineers of New Brunswick - Benefit to Society
Total Reduced Sulfer Collection System, Mirimichi, New Brunswick
Collection of LCHV (DNCG) to reduce pulp mill emissions;
automated blowers and moisture removal systems;
achieved 85% reduction of TRS emissions.
Water Treatment Plant Modernization, Zabrze, Poland
prime contractor for modernization and expansion of water filtration facility;
replaced green sand filter with Electromedia 1 technology;
increased daily production 80% using only existing filter vessels;
First installation of this technology in Europe.
Suite/Apartment Residence, Fredericton, New Brunswick
4 storey, 177 bed student residence on University campus;
building design integrated with Campus master Plan;
Construction Management Projects
Upper River Valley Hospital, Waterville, New Brunswick
contract to provide building and equipment new 70 bed, $78M hospital;
fast track project with 24 month construction schedule using sequential tendering;
17, 580 m2, 3 storey steel frame building;
on site water supply and wastewater treatment;
designed and built to LEED Silver requirements;
Woolastook Long Term Care Facility, Village of Gagetown, New Brunswick
40 bed, $6M facility on greenfields site;
Insulated Concrete Form construction;
completed on time and on budget;
received Canadian Building Incentive Program grant for energy efficiency.
Relocate Cheese Cutting Line, Truro, Nova Scotia
retrofit of existing warehouse space at dairy into a refrigerated process area;
dismantled and re-installed existing cheese cutting process line;
project completed under budget in 11 weeks.
Kchikhusis Commercial Centre, Fredericton, New Brunswick
provided project management to St. Mary’s First nation;
design and construction of 6,000 m2 retail office facility;
3 storey offices, 7 unit strip mall and grocery store;
project completed on budget within 11 months.
|
|